
Eaton Residences, KLCC
City View Ventures Sdn Bhd · Serviced residence · Leasehold · Completed
From RM 950,000 · 840–2,982 sq ft · 1–4 bed · Completion 2021
- 1Price against the areaRM 1,496-14% vs new launches nearby+88% vs completed condos
- 2The area+8.5%Change in Kuala Lumpur house prices over the four years to Q1 2026
- 3Other options at this price5Other new launches starting within 20% of RM 950,000
- 4Cost and risksRM 117,500Cash upfront and RM 3,941 a month after that
Eaton Residences is a leasehold serviced residence in KLCC, Kuala Lumpur, by City View Ventures. The developer has not published a price we can match to a layout. On PropertyGuru, a 635 sq ft unit has an asking price of RM950,000, about RM1,496 psf. That is 88% above the NAPIC 2025 median of RM796 psf for completed condos in KLCC. Project details checked against the developer's website on . The price is an asking price on PropertyGuru · Developer's project page
Location
KLCC, Kuala Lumpur
Nearby, as listed by the developer
- Petronas Twin Tower & Suria KLCC
- Kuala Lumpur Tower
- Merdeka PNB 118
- Tun Razak Exchange (TRX)
- Pavilion Kuala Lumpur
- Prince Court Medical Centre
- Gleneagles Hospital
- Int. School of Kuala Lumpur
- Alice Smith School
1Eaton Residences price compared with the area
The developer has not published a price we can match to a layout. On PropertyGuru (listed 9 Sep 2026), a 635 sq ft unit has an asking price of RM 950,000, about RM 1,496 per sq ft. That is an agent's asking price. The developer has not confirmed it.
PropertyGuru · 9 Sep 2026 · checked 2026-09-30
NAPIC recorded 10 completed condos in KLCC in 2025. Its entry price per sq ft is higher than three quarters of the prices recorded in the area. New launches usually cost more per sq ft than completed condos nearby.
See the 10 completed condos NAPIC recorded in KLCC on the area page.
- Eaton ResidencesRM 1,496
- DIVINE KLCCRM 1,928
- The ConlayRM 1,965
- Jewel by Oxley KLCCRM 2,139
- SO/ Kuala Lumpur ResidencesRM 2,406
Each developer's starting price divided by its smallest layout, unless the developer states a price per sq ft.
2The area
- Desa ParkcityRM 906
- KLCCRM 1,740 · 13 launchesRM 796
- BangsarRM 1,265 · 8 launchesRM 674
- Mont KiaraRM 1,034 · 5 launchesRM 639
- Damansara HeightsRM 567
- Sri HartamasRM 491
- Bukit JalilRM 793 · 9 launchesRM 482
- SentulRM 812 · 2 launchesRM 479
- KepongRM 684 · 4 launchesRM 457
- CherasRM 762 · 4 launchesRM 400
- SetapakRM 568 · 6 launchesRM 357
NAPIC 2025 data. Only areas with at least 5 recorded schemes are listed. Hover or tap an area for details.
Completed condos in KLCC changed 0% in price from 2024 to 2025 and -3.9% in the first half of 2026 (NAPIC, median per condo). See the price trend
House prices in Kuala Lumpur rose 8.5% in the four years to Q1 2026P, against 14.2% for Malaysia. See the state price and supply charts on the KLCC page.
3Other options at this price
Other new launches at a similar budget
Starting prices within 20% of RM 950,000, in Kuala Lumpur. Same area first.
| Project | Starting price |
|---|---|
| Centrix The StationDang Wangi · Same area | RM 945,800 |
| DIVINE KLCCKLCC · Same area | RM 968,000 |
| Skyline EmbassyJalan Ampang · Same area | RM 912,000 |
| Armani Hallson KLCCJalan Ampang · Same area | RM 1,102,000 |
| Sunway CochraneJalan Cochrane | RM 948,000 |
Similar price per sq ft
↑ Starting price
| Project | Entry psf | vs this |
|---|---|---|
| Sunway CochraneJalan Cochrane | RM 1,458 | -3% |
| Pavilion Embassy Kuala LumpurEmbassy Row | RM 1,581 | +6% |
| Orion ResidenceBukit Bintang | RM 1,411 | -6% |
| Times Square 2Bukit Bintang | RM 1,410 | -6% |
| Parkside ResidencesSetia Federal Hill | RM 1,592 | +6% |
| Khaya ResidencesBangsar | RM 1,392 | -7% |
| Southpoint ResidencesMid Valley City | RM 1,634 | +9% |
| 111 MenerungBangsar | RM 1,640 | +10% |
4Cost and risks
Listed asking priceRM 950,000
Monthly instalment
RM 3,941
Cash upfront (down payment and stamp duty)
RM 117,500
- Down payment
- RM 95,000
- Stamp duty on the transfer
- RM 22,500
- Loan amount
- RM 855,000
- Total interest over the loan
- RM 800,262
Based on the starting price, with stamp duty on the transfer only. Legal fees and loan stamp duty are extra. We apply the first-home exemption only up to RM500,000. Confirm it with your lawyer.
Things to check
- The project is completed. The price shown may be the launch price, so ask for the current price list.
- Leasehold: ask how many years remain on the lease.
- In Kuala Lumpur a foreign buyer needs state consent and can only buy a unit priced at RM 1,000,000 or more.
Project details+
- Developer
- City View Ventures Sdn Bhd (GSH Corporation)
- Location
- KLCC, Kuala Lumpur
- Property type
- Serviced residence
- Tenure
- Leasehold
- Total units
- 632
- Blocks / towers
- Not stated by the developer
- Storeys
- Not stated by the developer
- Expected completion
- 2021
Infinity edge lap pool · Dip pool · Wading pool · Gourmet kitchen · Steam room · Gym room · Yoga room · Multi-purpose hall · Games room · Sky lounge · Playground · BBQ pods · Day care · Jogging path
Eaton Residences floor plans and photos
Our take
- The entry price per sq ft is 88% above the median for completed condos in KLCC. Some of that gap is normal for a new building.
- Of the 5 new launches we track in KLCC, it has the lowest entry price per sq ft.
- Other new launches at a similar price per sq ft: Sunway Cochrane (RM 1,458 psf), Pavilion Embassy Kuala Lumpur (RM 1,581 psf) and Orion Residence (RM 1,411 psf).
- House prices in Kuala Lumpur rose 8.5% over the last four years.
- The project is completed, so you can view a finished unit before you buy.
More new launches in KLCC
Other new launches in Kuala Lumpur
Eaton Residences: common questions
Is Eaton Residences freehold or leasehold?
The developer lists it as leasehold.
When was Eaton Residences completed?
Eaton Residences was completed in 2021.
Can foreigners buy Eaton Residences?
Units priced at RM 1,000,000 or more meet Kuala Lumpur's minimum for foreign buyers. Cheaper units do not.
Sources
Project facts come from the developer's website. Area prices and yields come from NAPIC's Laporan Pasaran Harta 2025. State figures come from the MHPI (Q1 2026P) and the NAPIC overhang tables (Q1 2026). No developer pays us.