RumahCheck
M Nova, Kepong

M Nova, Kepong

Mah Sing Group Berhad · Serviced residence · Leasehold · Selling

RM 466,560 to RM 722,160 · 700–1,000 sq ft · Completion 2028

This price is from an advertising permit that expired on 9 Nov 2026. The developer may have changed it.

Check a quote

  1. 1Price against the areaRM 667-5% vs new launches nearby+46% vs completed condosEstimated: starting price ÷ smallest layout
  2. 2The area+8.5%Change in Kuala Lumpur house prices over the four years to Q1 2026 · High unsold supply in the state
  3. 3Other options at this price5Other new launches starting within 20% of RM 466,560
  4. 4Cost and risksRM 54,987Cash upfront and RM 1,936 a month after that

M Nova is a leasehold serviced residence in Kepong, Kuala Lumpur, by Mah Sing. The developer lists prices from RM466,560. If that price is for the smallest layout (700 sq ft), it is about RM667 psf. That is 46% above the NAPIC 2025 median of RM457 psf for completed condos in Kepong. Checked against the developer's website on · Developer's project page

Location

1M Nova price compared with the area

Prices start from RM 466,560. If that price is for the smallest layout (700 sq ft), it works out to about RM 667 per sq ft.

NAPIC recorded 5 completed condos in Kepong in 2025. Its entry price per sq ft is higher than every price NAPIC recorded in the area. New launches usually cost more per sq ft than completed condos nearby.

This launch
RM 667
Ppa1m Metropolitan Kepong RM 240Kondominium Mulberi RM 430Menjalara 18 RM 457The Henge Residence RM 478Residensi 333 Kepong / Three33 Residensi RM 639
Middle half of recorded prices: RM 430 – RM 478+46% vs median

See the 5 completed condos NAPIC recorded in Kepong on the area page.

Price per sq ft of new launches in Kepong

Each developer's starting price divided by its smallest layout, unless the developer states a price per sq ft.

The developer does not publish a price per sq ft. Ask for the price list. If the starting price is for a bigger layout, the entry price per sq ft is lower than shown here.

2The area

Price per sq ft by area in Kuala Lumpur
Completed condos, medianNew launches, medianThis launch RM 667
RM psf
  • Desa ParkcityRM 906
  • KLCCRM 1,740 · 13 launchesRM 796
  • BangsarRM 1,265 · 8 launchesRM 674
  • Mont KiaraRM 1,034 · 5 launchesRM 639
  • Damansara HeightsRM 567
  • Sri HartamasRM 491
  • Bukit JalilRM 793 · 9 launchesRM 482
  • SentulRM 812 · 2 launchesRM 479
  • KepongRM 684 · 4 launchesRM 457
  • CherasRM 762 · 4 launchesRM 400
  • SetapakRM 568 · 6 launchesRM 357

NAPIC 2025 data. Only areas with at least 5 recorded schemes are listed. Hover or tap an area for details.

House prices in Kuala Lumpur rose 8.5% in the four years to Q1 2026P, against 14.2% for Malaysia. See the state price and supply charts on the Kepong page.

3Other options at this price

Other new launches at a similar budget

Starting prices within 20% of RM 466,560, in Kuala Lumpur. Same area first.

ProjectStarting price
M ZenyaMetropolitan Park · Same areaRM 420,000
Tuan Heritag3SegambutRM 468,888
Aricia ResidencesKuala LumpurRM 461,000
River Park Bangsar SouthBangsar SouthRM 478,000
Chancery AmpangJalan AmpangRM 455,000
See more new launches at this budget

Similar price per sq ft

Starting price and price per sq ft of each optionHover or tap a dot
M Nova (this launch)KepongRM 667 psf · RM 466,560

↑ Starting price

ProjectEntry psfvs this
The ReyaKL EastRM 6660%
Ayanna Resort ResidencesBukit JalilRM 6700%
LEVIA ResidenceCherasRM 660-1%
Tuan Straits ResidencyDesa PetalingRM 675+1%
ASA ResidenceSri PetalingRM 676+1%
PapyrusNorth KiaraRM 687+3%
Silverlake ResidencesKuala LumpurRM 646-3%
M AspiraTaman DesaRM 640-4%

4Cost and risks

Starting priceRM 466,560

Buyer

Monthly instalment

RM 1,936

Cash upfront (down payment and stamp duty)

RM 54,987

Down payment
RM 46,656
Stamp duty on the transfer
RM 8,331
Loan amount
RM 419,904
Total interest over the loan
RM 393,021

Based on the starting price, with stamp duty on the transfer only. Legal fees and loan stamp duty are extra. We apply the first-home exemption only up to RM500,000. Confirm it with your lawyer.

Been quoted a price for a unit here?

Enter it and we will compare it with NAPIC prices and rents for the area.

Things to check

  • Leasehold: ask how many years remain on the lease.
  • In Kuala Lumpur a foreign buyer needs state consent and can only buy a unit priced at RM 1,000,000 or more.
Project details+
Developer
Mah Sing Group Berhad
Location
Kepong, Kuala Lumpur
Property type
Serviced residence
Tenure
Leasehold
Total units
1,248
Blocks / towers
Not stated by the developer
Storeys
Not stated by the developer
Expected completion
2028

Multi-tier security · EV charging stations · Delivery parcel lockers · Automated waste collection system

M Nova floor plans and photos

Our take

  • The entry price per sq ft is 46% above the median for completed condos in Kepong. A gap of this size is common for a new launch.
  • Of the 3 new launches we track in Kepong, it has the lowest entry price per sq ft.
  • Other new launches at a similar price per sq ft: The Reya (RM 666 psf), Ayanna Resort Residences (RM 670 psf) and LEVIA Residence (RM 660 psf).
  • Many completed condos in Kuala Lumpur are still unsold. That can make a unit slower to resell or rent out.

More new launches in Kepong

Other new launches in Kuala Lumpur

More new launches by Mah Sing

M Nova: common questions

How much is M Nova in Kepong?

The developer lists prices from RM 466,560. If that price is for the smallest layout, it works out to about RM 667 per sq ft.

Is M Nova freehold or leasehold?

The developer lists it as leasehold.

When will M Nova be completed?

The developer gives 2028 as the expected completion date.

Can foreigners buy M Nova?

Every price the developer lists is below Kuala Lumpur's RM 1,000,000 minimum for foreign buyers, so a foreign buyer would not qualify at these prices.

Sources

Project facts come from the developer's website. Area prices and yields come from NAPIC's Laporan Pasaran Harta 2025. State figures come from the MHPI (Q1 2026P) and the NAPIC overhang tables (Q1 2026). No developer pays us.